News

联系我们

Industry News

网站首页 » News » Industry News

There are some ways to prevent marble cracks

时间:2020-06-09 02:04:08  来源:  总浏览:1399   字体:16px | 14px | 12px

Natural marble is the purest and natural material used in home decoration design. The marble's material and texture are very unique. As long as it is given its unique artistic conception, it can evolve beautiful and colorful patterns and enhance the grade of the entire space. More and more people use marble for wall or floor in home improvement, but due to the lack of pre-maintenance and other causes of various fractures and hollowing, in order to avoid these problems, you should know to prevent cracking and installing marble How to deal with after cracking.

marble

Precaution

1. Preventive measures against cracking caused by marble materials

Before laying marbles, marbles should be inspected. Stones with hidden quality hazards, such as dark cracks and pinching, are found to be removed or repaired and made up. In this way, it is possible to avoid the lesions and damage that occur after the marble is paved with moisture and some harmful pollution, and to prevent its expansion.

Before laying the marble, you must also understand the ground structure and observe whether the structure is a rigid body and whether the cushioned layer is hollow and cracked. When laying stone on the expansion joints and settlement joints of the building, you must choose the corresponding method according to the atlas. The construction of the disconnected construction must be disconnected. Do not lay simple drawings and directly lay up.

In the selection of ground marble materials, we should select materials according to the characteristics of the stone. Stone materials such as wood grainstone and soft materials, and golden century beige and other stones with more cracks in the stone, should be avoided as ground stone.

marble room

2. Preventive measures against cracking caused by external forces

When laying marbles, such as improper construction skills or excessive pressure during use will cause the marble to crack. Therefore, when laying stones, use a rubber hammer to strike the stone. The strike force is appropriate. It is easy to knock lightly and disperse the strike. Then try to avoid the marble bearing the pressure that exceeds the load.

It is very important to ensure the temperature during curing, and the temperature must not be lower than 5 degrees during construction and curing. When the temperature is lower than 5 degrees, it is necessary to add antifreeze during construction. The cost of adding antifreeze is high, and the effect is not ideal when the temperature is too low.

DAFON is a professional stone machine factory that integrates design, manufacture, and trading as one. We mainly produce a multiblade stone cutting machine(especially for curbstone/kerbstone/cobblestone/paver stone etc), infrared edge cutting machine, automatic line polishing machine, full automatic edge cutting machine line, multiblade stone block cutter, flaming machine, bush hammer machine, chamfering machine, wire saw machine, quarry mining machine and all sorts of stone cutting and processing machines. 

Website:www.dafonmachine.com